This project involved construction of an air-field tunnel, runways, taxiways, aprons and fire stations, with bulk earthwork reaching two million cubic metres. Storm water drains spanned 42 kilometres, while ductwork reached 410 kilometres and water supply pipe 42 kilometres.
We are also involved in building the third runway system that started in 2016, and is scheduled to be completed by 2024.